Chemistry Air Handler Unit Replacement, Bldg. 557

FM200166S/103-00

Status

Accepting Bids

Prebid Date10/17/19 1:30 pm

Bid Date10/31/19 2:30 pm

Company & Contacts

UCSB Design and Construction Services

Jennifer Pierce, University Rep.   jennifer.pierce@ucsb.edu

Location

UCSB Campus

Summary of Work: As described more fully in the Construction Documents, provide all labor, materials, equipment, tools, transportation, insurance, and services to replace three (3) University-Furnished/Contractor-Installed (“UFCI”) air handler units and provide all associated control valves, piping and roof curbs at the Chemistry Building 557 on the University of California, Santa Barbara campus.

Estimated Construction Cost: $300,000

License Requirement(s):

C-4 (Boiler Hot Water Heating & Steam Fitting Contractor)

or

C-20 (Warm-Air Heating, Ventilation & A/C Contractor)

General Information: Bidders are NOT required to provide Bid Security as part of their respective bid submittals for this particular solicitation.

Every effort will be made to ensure that all persons shall have equal access to contracts and other business opportunities with the University within the limits imposed by law or University’s policy. Each Bidder may be required to show evidence of its equal employment opportunity policy.

The successful Bidder and its subcontractors will be required to follow the nondiscrimination requirements set forth in the Bidding Documents and to pay prevailing wage at the location of the work.

The work described in the contract is a public work subject to section 1771 of the California Labor Code. No contractor or subcontractor may be listed on a Bid for this project unless registered with the Department of Industrial Relations (“DIR”) pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].