One-on-One Plan Review for the Harold Frank Hall AHU Replacement

FM200305P

Status

Accepting Bids

Bid Date3/3/20 4:00 pm

Company & Contacts

UCSB Design and Construction Services

James Gonzales, University Rep.   james.gonzales@ucsb.edu

Location

UCSB Campus

The University is seeking input and feedback on its draft CDs for this project; BIDS ARE NOT REQUIRED AT THIS TIME.

DESCRIPTION: In March 2020, the University of California, Santa Barbara (“University”) will be releasing a bid solicitation seeking the services of a (i) B- (General Building), (ii) C-4 (Boiler, Hot Water Heating a& Steam Fitting) AND/OR (iii) C-20 (Warm Air Heating, Ventilation & A/C) licensed contractor to construct the Harold Frank Hall AHU Replacement project (the “Project”), located at the University’s Engineering Building 556 on the main campus (see 50% CDs Sheet No. T0.1). The project will require the removal and replacement of two (2) air handler units AC-1 and HV-1 and the removal of the DX system currently serving the computer lab with two (2) like kind AHUs and two (2) 4-pipe fan coil units.

The estimated construction cost for this scope of work is in the range of $750,000 to $950,000. The anticipated construction start date is April 2020.

ONE-ON-ONE PLAN REVIEW MEETING: The University is seeking contractor and subcontractor participation for scheduled, one-on-one plan review meetings that will be conducted by the University Representative to elicit general feedback on the draft Construction Documents developed by a University-hired Architect for the Harold Frank Hall AHU Replacement project. No bids are due at this time.

The University will use the feedback and comments from participants to inform the completion of the 100% Construction Documents associated with the project, thereby providing increased clarity and facilitating more cost effective and competitive bids from the contracting community. Note, all firms participating in the one-on-one plan review meetings WILL be permitted to bid on the project once it is advertised by the University.

All interested contractors holding any valid and current CSLB license classification(s) relevant to the Project are highly encouraged to participate in a scheduled, one (1) hour, one-on-one plan review meeting. The meetings will be set up by the University Representative, James Gonzales, who will conduct the plan review with individual contractors, in order to obtain maximum input and maintain confidentiality. Draft project documents (e.g., plans) have been posted on the UCSB plan room for contractor review.

MEETING FORMAT: Issues to be discussed at the one-on-one plan review meetings include:

1. Biddability/Buildability
2. General design risks and assumptions.
3. Anticipated construction risks and/or special project considerations.

Meetings will take place on the UCSB campus.

UNIVERSITY CONTACT: If your firm is interested in scheduling a one-on-one plan review meeting time, please contact the University Representative, James Gonzales, at james.gonzales@ucsb.edu, by Tuesday, March 3, 2020 at 4:00 p.m.