Formal Bids
Sort by
Date Posted
Bids Due in 2 days
9/18/25 2:30pm
Electronic bidding
Engineering II Electrical Switchgear and Infrastructure Replacement (Prequalified Bidders ONLY)
Bids Due in 2 days
UCSB Design and Construction Services
UCSB Campus
Project No. FM240240L/100-32
Bidding Closed
8/19/25 2:30pm
Santa Cruz Island Reserve Container Homes Build Out (Design-Build)
Bidding Closed
UCSB Design and Construction Services
Santa Cruz Island
Project No. FM250448S/986000
Bids Due in 2 months
11/21/25 2:00pm
Electronic bidding
PCL ABATEMENT & DEMO PACKAGE NO. BP-04: East Campus Student Housing (Prequalified Subs ONLY)
Bids Due in 2 months
UCSB Design and Construction Services
UCSB Campus
Lump Sum, Design-Build and or Design Assist Subtrade Packages (See below for details)